January 23, 2024 · Transport

Heavy and out-of-gauge cargo: project shipping

Heavy and out-of-gauge cargo: project shipping

Transformers, tanks, construction machinery, production lines: some goods do not fit in a standard container. This is known as out-of-gauge cargo or project cargo.

Sea freight options

  • Open top: a container without a roof, loaded by crane, for goods that are too tall
  • Flat rack: a platform with two end walls, for wide or very heavy items
  • Breakbulk: goods are loaded directly into the hold or onto the deck of the vessel
  • Ro-ro: for wheeled or tracked machinery

Preparation

Precise stowage plans are needed: dimensions, weight, centre of gravity, lifting points. Poor securing can damage the goods or the vessel.

At the port and on the road

Unloading requires suitable lifting equipment. Road transport in Morocco may require an exceptional transport permit, an escort and a surveyed route.

Customs clearance

Industrial equipment may qualify for special procedures (investment schemes, temporary admission). A project delivered in several shipments requires careful coordination of declarations.

Our advice

Involve your customs broker from the purchasing stage: transport constraints affect dismantling, packaging and scheduling.

Have an out-of-gauge project? Transit Slimani organises transport and customs clearance from start to finish. Tell us about your project.